Poprad
270 m2
12/2012

Poprad
2 tony
12/2012

Krivany
100 m2
12/2012

Dargov
25 m2
12/2012

Levoča
100 litrov
11/2012

Sečovce
200 m2
11/2012

Košice - okolie
25 m2
11/2012

Košice
50 m2
11/2012

Krupina
200 m2
10/2012

Košice - okolie
300 m2
10/2012

Zvolen
250 m2
10/2012

Košice
130 m2
09/2012

Hozelec
Vstupné zádverie
09/2012

Prešov
2 garáže
09/2012

Košice
750 m2
09/2012

Košice
50 m2
08/2012

Dubník
130 m2
08/2012

Košice
20 m2
08/2012

Turiec
Garáž, schodisko, steny
07/2012

Poprad
Podlaha,dilatácie
07/2012

Rešica
250 m2
06-07/2012

Rešica
170 m2
05-06/2012

Košice - okolie
160 m2
06/2012

Prakovce
50 m2
05/2012

Valaliky
200 m2
04/2012

Krompachy
50 m2
04/2012

Košice
50 m2
04/2012

Košice
Suterén a garáž
04/2012

Humenné
šachta
04/2012

Košice
16 prestupov
03/2012

Košická Nová Ves
Trhliny stropu
03/2012

Hotel

Preventing from ingress

In the objective wells, massive water infiltration was occurred. The joints were injected through by sealing material based on the Polyurethane. After injecting, the insulation braces in two layers were applied.

Heľpa
2 wells
02/2012

Lift well

Preventing from ingress

In the objective wells, massive water infiltration was occurred. The well was cut down up to the carrying base. The joints and passages were injected through by sealing materials based on Polyurethane. After injecting, insulation braces in two layers were applied.

Liptovský Mikuláš
Well
02/2012

Store spaces

Industry floor with levelling

Original marmot and ceramic pavement was ground by diamond. Special thixotropic Epoxy was applied as a connecting bridge. Levelling was used to flatten the spaces. The surface was penetrated repeatedly. The walkway layer was created by Epoxy by RAL 1001 required by the investor.

Humenné
250 m2
02/2012

Polyfunctional object

Joint-free industry floor of light colour

Screeding was ground by diamond grinding machine. The floor was penetrated and poured by sand. After hardening, the layer of UV table resin based on the Epoxy was applied. The investor required light futuristic shade.

Košice
200 m2
01/2012

Garage

Reconstruction of the object walls

The garage showed ingress. The original concrete was incohesive. The masonry should be statically linked with strength injection, which serves as water-proof barrier simultaneously. Insulation braces in two layers were applied to the base. Reconstruction plaster was applied to the walls.

Košická Nová Ves
2 t of material
01/2012

Villa

Preventing from ingress into basement spaces

The basement showed ingress on the level of contact of walls with the floor. The injection was performed because of statical linkage of bricks and following preventing from ingress. After injecting, special insulation on internal wall was applied.

Topoľčany
Basement circumference
01/2012